[1] 丁荣涛.基于协作能力约束的港口集卡调度优化策略[J].清华大学学报:自然科学版,2012,52(8):1 158-1 164.
[2]梁剑,王强,安俊英.铁路集装箱中心站内部集卡调度和箱位配置[J].计算机工程,2012,38(8):213-220.
[3]尚晶.面向双40英尺岸桥的码头集卡调度模型与算法[J].华中科技大学学报:自然科学版,2010,38(11):84-87.
[4]曾庆成,杨忠振.集装箱码头集卡调度模型与Q学习算法[J].哈尔滨工程大学学报,2008,29(1):1-4.
[5]曾庆成.集装箱码头装卸作业集成调度模型与方法[D].大连:大连海事大学计算机科学与技术学院,2008.
[6]Pyung H K,Woon S L,Dong W J.Fleet sizing and vehicle routing for container transportation in a static environment[J].OR Spectrum,2004,26(2):193-209.
[7]Ren Q D E J,Wang Y P.A new hybrid genetic algorithm for job shop scheduling problem[J].Computers and Operations Research,2012,39(10):2 291-2 299.
[8]何大勇,查建中,姜义东.遗传算法求解复杂集装箱装载问题方法研究[J].软件学报,2001,12(9):1 380-1 385.
[9]Glover F,Laguna M.Tabu Search[M].Dordrecht:Kluwer Academic Publishers,1997.
[10]Zhang C Y,Li P G,Guan Z L,et al.A tabu search algorithm with a new neighborhood structure for the job shop scheduling problem[J].Computers and Operations Research,2007,34(11):3 229-3 242.
[11]Van Laarhoven P J M,Aarts E H L,Lenstra J K.Job shop scheduling by simulated annealing[J].Operations Research,1992,40(1):113-125.
[12]Nowicki E,Smutnicki C.A fast taboo search algorithm for the job shop scheduling problem[J].Management Science,1996,42(6):797-813.
[13]Nasiri M M,Kianfar F.A GES/TS algorithm for the job shop scheduling[J].Computers and Industrial Engineering,2012,62(4):946-952.